Compliance Sign-OffNew Builds · Fit-Outs · Refurbishments

Post-Construction Builder's Clean

Before live hardware enters a new or refurbished data hall, construction particulate must be completely eliminated. AMCORN runs multi-phase pre-commissioning cleans and certifies your environment to the required ISO class before first equipment power-on.

What's included

  • Multi-phase clean programme
  • Construction dust type characterisation
  • ISO class certification sign-off
  • Contractor handover documentation pack
  • Pre-commissioning particle count record

Every visit includes a digital compliance report

Delivered within 24 hours. Particle counts, operative records, photographic evidence, ISO classification - formatted for Uptime Institute, ISO 27001, and PCI DSS audits.

Get a quote

Request a site assessment

Tell us about your facility and we'll respond within one business day. No obligation, no sales calls without permission.

Request a Site Assessment
ISO-14644 certified
DV-cleared operatives available
24hr compliance report delivery

Related Services

IoT-Verified

Raised Floor & Plenum Cleaning

Particulate accumulation in sub-floor plenum spaces is the primary source of heat sink contamination and cooling inefficiency in active data halls. AMCORN deploys HEPA-filtered vacuum systems and ESD-safe equipment, with particle count verification before and after every clean.

Data Centres · Server RoomsLearn more
ML-Dispatched

Active Equipment Cleaning

Server rack, UPS, PDU, and networking equipment cleaning performed live or during scheduled maintenance windows. AMCORN's ML dispatch engine analyses your facility's sensor data and service history to predict the optimal cleaning interval - before degradation becomes a risk, not after.

Server Racks · UPS · PDUs · NetworkingLearn more
Sensor-Monitored

CRAC / CRAH Unit Cleaning

Blocked cooling coils are a leading cause of unplanned thermal events. AMCORN cleans coils, drain pans, and airflow paths to restore rated thermal performance - and installs temperature and humidity sensors to monitor cooling efficiency continuously between cleans.

Cooling InfrastructureLearn more